ÜCRET HESAPLAMA VE ARAÇ SINIFLARI

Giriş
Çıkış
1. SINIF
1. SINIF

AKS ARALIĞI (DİNGİL MESAFESİ) 3.20 METRE ALTINDA OLAN ARAÇLAR 1. SINIFTIR. OTOMOBİL, KAMYONET, MİNİBÜS, ARAZİ TAŞITI VB.

2.SINIF
2.SINIF

AKS ARALIĞI 3.20 METRE VE ÜZERİNDE OLAN HER TÜRLÜ 2 AKSLI ARAÇ 2.SINIFTIR. MİNİBÜS, KAMYONET, OTOBÜS VB. 

3.SINIF
3.SINIF

AKS ADEDİ (DİNGİL SAYISI) 3 TANE OLAN HER TÜRLÜ ARAÇ 3.SINIF ARAÇTIR. 

4.SINIF
4.SINIF

DİNGİL SAYISI 4 VE 5 ADET OLAN HER TÜRLÜ ARAÇ 4.SINIF ARAÇTIR.

5.SINIF
5.SINIF

DİNGİL SAYISI 6 VE DAHA FAZLA OLAN KAMYON TREYLER VB. ARAÇLAR

6.SINIF
6.SINIF

MOTOSİKLETLER

GİRİŞ GİŞESİ : KINALI ÇIKIŞ GİŞESİ : YASSIÖREN
TL

Harita ile yol güzerhanızı belirleyebilir
zamandan ne tasarruf sağlayacağınızı öğrenebilirsiniz

Giriş
Çıkış

Yol Güzergahında ki tesislerimiz
SEE ALL FACILITIES

NORTH MARMARA MOTORWAY KINALI-ÇATALCA SECTION HAS BEEN PUT INTO SERVICE

NORTH MARMARA MOTORWAY KINALI-ÇATALCA SECTION HAS BEEN PUT INTO SERVICE

Kınalı-Çatalca section of the 400 km long Northern Marmara Motorway, which connects Aegean Marmara and Central Anatolia without interruption, has been put into service

85 PERCENT OF THE NORTHERN MARMARA MOTORWAY IS COMPLETED

85 PERCENT OF THE NORTHERN MARMARA MOTORWAY IS COMPLETED

85 percent of the work on the Northern Marmara Motorway has been completed. Kocaeli section of the works, which are planned to be completed on 21 December 2020, were viewed from the air.

NORTHERN MARMARA MOTORWAY WORKS HAVE BEEN VIEWED FROM AIR.

NORTHERN MARMARA MOTORWAY WORKS HAVE BEEN VIEWED FROM AIR.

85% of the works have been completed on the Northern Marmara Motorway, which is a first in the world with tunnels where 4 vehicles can pass side by side by connecting two continents.

WORKS ON THE NORTHERN MARMARA MOTORWAY CONTINUE AT FULL SPEED

WORKS ON THE NORTHERN MARMARA MOTORWAY CONTINUE AT FULL SPEED

85% of the works have been completed on the Northern Marmara Motorway, which is a first in the world with tunnels where 4 vehicles can pass side by side by connecting two continents.

NORTH MARMARA MOTORWAY KINALI-ÇATALCA SECTION HAS BEEN PUT INTO SERVICE

85 PERCENT OF THE NORTHERN MARMARA MOTORWAY IS COMPLETED

NORTHERN MARMARA MOTORWAY WORKS HAVE BEEN VIEWED FROM AIR.

WORKS ON THE NORTHERN MARMARA MOTORWAY CONTINUE AT FULL SPEED